Extracted text
Quarterly Report
PUBLIC WORKS QUARTERLY REPORT
Fiscal Year 2024/2025
First Quarter: June 1, 2024 – August 31, 2024
Highway
•
Cleaned sanitary sewer lines
•
Swept 140 miles of roadway
•
Started the yard waste removal program throughout the Village
•
Installed Veterans banners throughout the Village
•
Removed and replaced banners for various Village events
•
Installed summer banners and American flags throughout Village
•
Repaired 7 catch basins
•
Cleaned out 64 catch basins
•
Weekly asphalt maintenance (potholes and water patches)
•
Trimmed approximately 40 trees
•
Removed 12 trees (including grinding leftover stumps)
•
Planted 3 trees
•
Train Station parking lot plantings
•
Installed 2 new kayak racks at Echo Canoe Launch
Sanitation:
•
Collected approximately 743 tons of refuse
•
Weekly collection of Village co-mingled, paper and metal recycling
•
Collected approximately 199 tons of organic waste
Building Maintenance:
•
Refinished VCT floors at Grand Street and Harmon Firehouses.
•
Refurbished street lights on North Riverside Avenue.
•
Installed speed sign on Maple Street.
•
Installed cameras at Black Rock Park.
•
Replaced various signage throughout Village.
Water Department:
•
Meter reading for water billing
•
Painted hydrants
•
Maintenance to pumps and motors
•
Plumbing work at Senasqua Bathhouse, EMS house, and Croton Landing
•
Westchester County Health Department inspection
•
Semi-annual lead and copper samples
•
Responded to 127 code 53-mark outs
•
Submission of monthly reports to Westchester County
•
Completed Mage Meter installation at Well Field
•
Mag Meter / Flow meter calibrations
•
Worked with contractor on 41-51 Maple Street for existing and proposed water connections
•
Assist DPW on low staff days
Department of Public Works
Quarterly Report
•
Completed monthly water sampling
Parks Department:
•
Continued mowing of lawns/field in all Village parks
•
Litter removal in Village parks and fields
•
Assistance with Village entertainment programs at Senasqua
•
Assistance with the planning of Oktoberfest
•
Assisted with Village Arts Festival at Senasqua
Repair Facility:
•
Preparing all necessary vehicles and equipment for the upcoming leaf season
•
Weekly inspection and maintenance of all police vehicles
•
Assist Fire Department with vehicle maintenance
•
Auctioned 2 DPW vehicles for surplus. Funds to be used for replacement and equipment
Capital Projects:
•
Continue discussions with contractor for Train Station Parking Lot solar project
•
Continued the in-house renovation of the Police Department
•
Completed new parking lot on Wayne Street
•
Moved utilities (drainage, electric, gas) at Harmon Firehouse addition (new EMS) to
accommodate new foundation for building
•
Scheduled delivery of granite curbing at Gotwald Circle
•
Continue design of Brook Street drainage with design Engineer