Home / Hill, William R. Modifications of the Plan of the New Croton Dam. Paper read before the American Water Works Association, St. Louis, Missouri, June 8, 1904. Pamphlet T 462, Cornell University Library. / Passage

Modifications of the Plan of the New Croton Dam

Hill, William R. Modifications of the Plan of the New Croton Dam. Paper read before the American Water Works Association, St. Louis, Missouri, June 8, 1904. Pamphlet T 462, Cornell University Library. 317 words

feet , would not have sufficient strength to resist the water pressure that would come against them , and their de- struction might result in a great losss of water from the reservoir and the demolition of the embankment , by the rush of water in falling a height of 150 feet to reach the valley below . On Dec. 18 , 1902 , on the writer's recom- mendation the Aqueduct Commissioners approved a plan providing for the reinforcement of these walls . The preliminary estimate of the cost to construct the dam under the original plan was $ 4,150,573 . This will be increased to about $ 6,400,000 . The great increase in the cost of the work is due principally to the four above de- scribed additions and modifications namely : the extra depth excavated under the main stone dam , the first ex- tension of 110 feet of the main stone dam , the extension of the main stone dam necessitating the removal of the embankment and core wall and lastly the additional ex- cavation necessary for the foundation of the last exten- sion . Some idea of what these changes have necessitated may be gained from the consideration of but two items , that of the amount of earth excavation which will be trebled and that of the amount of masonry which will be increased from 550,000 to about 800,000 cubic yards . The value of the work done to March 1 , 1904 is $ 5,363,000 . This most important of all structures to this great city , upon which its welfare would be almost wholly depend- ent , had to be mantled with all possible safeguards against its destruction . Thus the writer being brought face to face with the one paramount necessity that of the safety of this structure , was left no alternative but to modify the plan .