croton.news
Croton’s #1 source for AI-generated hyperlocal news
Croton-on-Hudson, New York · Friday, July 31, 2026· Jul 31, 2026
Source-linkedCorrections welcomed
DocumentsBoard Of Trustees, 2022-06-21

EAF Part II and Part III

resolution 2 pages
From the meeting: Board Of Trustees — 2022-06-21
Agenda item: Proposed Resolutions — Consider adopting EAF Parts 2 and 3 Determination of Significance attached hereto, adopting a Negative Declaration under SEQRA and a statement of consistency with the Village's LWRP in connection with adopting Local Law Introductory No. 7 of 2022 as drafted for such purposes.
Resolution, 2 pages. Attached to agenda item: “Proposed Resolutions — Consider adopting EAF Parts 2 and 3 Determination of Significance attached hereto, adopting a Negative Declaration under SEQRA and a statement of consistency with the Village's LWRP in connection w”
Retrieved 2026-07-31 from the village's meeting portal. View the original PDF ↗
Also attached to this agenda item: CAF for Stretch Code EAF for Stretch Code Energy Code Memo LWRP LL Intro 7 Local Law Intro 7 of 2022 NYStretch NY State Stretch Code Planning Board Memo NYS Stretch for Residences-Summary and FAQ -... NYStretch-Energy-Code-2020 3 NYStretch-Energy-Code-2020 Comparison Res 100-2022 LL Intro 7 Adoption Res 62-2022 LL Intro 7 PH WAC Memo on NYStretch Code 2022
Date: Part 2 is to be completed by the Lead Agency. Answer all of the following questions in Part 2 using the information contained in Part 1 and other materials submitted by the project sponsor or otherwise available to the reviewer. When answering the questions the reviewer should be guided by the concept “Have my responses been reasonable considering the scale and context of the proposed action?” No, or small impact may occur Moderate to large impact may occur 1. Will the proposed action create a material conflict with an adopted land use plan or zoning regulations? 2. Will the proposed action result in a change in the use or intensity of use of land? 3. Will the proposed action impair the character or quality of the existing community? 4. Will the proposed action have an impact on the environmental characteristics that caused the establishment of a Critical Environmental Area (CEA)? 5. Will the proposed action result in an adverse change in the existing level of traffic or affect existing infrastructure for mass transit, biking or walkway? 6. Will the proposed action cause an increase in the use of energy and it fails to incorporate reasonably available energy conservation or renewable energy opportunities? 7. 8. Will the proposed action impair the character or quality of important historic, archaeological, architectural or aesthetic resources? 9. Will the proposed action result in an adverse change to natural resources (e.g., wetlands, waterbodies, groundwater, air quality, flora and fauna)? 10. Will the proposed action result in an increase in the potential for erosion, flooding or drainage problems? 11. Will the proposed action create a hazard to environmental resources or human health? LL Intro 7 of 2022 6/6/2022             PRINT FORM For every question in Part 2 that was answered “moderate to large impact may occur”, or if there is a need to explain why a particular element of the proposed action may or will not result in a significant adverse environmental impact, please complete Part 3. Part 3 should, in sufficient detail, identify the impact, including any measures or design elements that have been included by the project sponsor to avoid or reduce impacts. Part 3 should also explain how the lead agency determined that the impact may or will not be significant. Each potential impact should be assessed considering its setting, probability of occurring, duration, irreversibility, geographic scope and magnitude. Also consider the potential for short- term, long-term and cumulative impacts. Check this box if you have determined, based on the information and analysis above, and any supporting documentation, that the proposed action may result in one or more potentially large or significant adverse impacts and an environmental impact statement is required. Check this box if you have determined, based on the information and analysis above, and any supporting documentation, that the proposed action will not result in any significant adverse environmental impacts. Date _________________________________________________ _______________________________________________ Print or Type Name of Responsible Officer in Lead Agency Title of Responsible Officer _________________________________________________ _______________________________________________ Signature of Responsible Officer in Lead Agency Signature of Preparer (if different from Responsible Officer) Date:  Croton-on-Hudson Village Board of Trustees 6/21/2022 Bryan Healy Village Manager PRINT FORM

Machine-extracted for search and reference — the original PDF is the authoritative version.

Experimental project: croton.news uses AI to generate articles from public records. Content may contain errors. Please report any inaccuracies and check our corrections log.