croton.news
Croton’s #1 source for AI-generated hyperlocal news
Croton-on-Hudson, New York · Friday, July 31, 2026· Jul 31, 2026
Source-linkedCorrections welcomed
DocumentsBoard Of Trustees, 2022-06-21

EAF for Stretch Code

resolution 3 pages
From the meeting: Board Of Trustees — 2022-06-21
Agenda item: Proposed Resolutions — Consider adopting EAF Parts 2 and 3 Determination of Significance attached hereto, adopting a Negative Declaration under SEQRA and a statement of consistency with the Village's LWRP in connection with adopting Local Law Introductory No. 7 of 2022 as drafted for such purposes.
Resolution, 3 pages. Attached to agenda item: “Proposed Resolutions — Consider adopting EAF Parts 2 and 3 Determination of Significance attached hereto, adopting a Negative Declaration under SEQRA and a statement of consistency with the Village's LWRP in connection w”
Retrieved 2026-07-31 from the village's meeting portal. View the original PDF ↗
Also attached to this agenda item: CAF for Stretch Code EAF Part II and Part III Energy Code Memo LWRP LL Intro 7 Local Law Intro 7 of 2022 NYStretch NY State Stretch Code Planning Board Memo NYS Stretch for Residences-Summary and FAQ -... NYStretch-Energy-Code-2020 3 NYStretch-Energy-Code-2020 Comparison Res 100-2022 LL Intro 7 Adoption Res 62-2022 LL Intro 7 PH WAC Memo on NYStretch Code 2022
Part 1 – Project Information. The applicant or project sponsor is responsible for the completion of Part 1. Responses become part of the application for approval or funding, are subject to public review, and may be subject to further verification. Complete Part 1 based on information currently available. If additional research or investigation would be needed to fully respond to any item, please answer as thoroughly as possible based on current information. Complete all items in Part 1. You may also provide any additional information which you believe will be needed by or useful to the lead agency; attach additional pages as necessary to supplement any item. Project Location (describe, and attach a location map): E-Mail: State: 1. Does the proposed action only involve the legislative adoption of a plan, local law, ordinance, administrative rule, or regulation? If Yes, attach a narrative description of the intent of the proposed action and the environmental resources that may be affected in the municipality and proceed to Part 2. If no, continue to question 2. NO YES 2. Does the proposed action require a permit, approval or funding from any other government Agency? If Yes, list agency(s) name and permit or approval: NO YES 3. a. Total acreage of the site of the proposed action? c. Total acreage (project site and any contiguous properties) owned or controlled by the applicant or project sponsor? 4. Check all land uses that occur on, are adjoining or near the proposed action: Aquatic Other(Specify): □ Urban □ Forest SEAF 2019 Parkland Adoption of Local Law Introductory No. 7 of 2022 Village-wide The Village of Croton-on-Hudson would like to amend Chapter 86 of the Village Code, Building Construction, to adopt the NYStretch Energy Code.  5. a. b. NO YES N/A 6. Is the proposed action consistent with the predominant character of the existing built or natural landscape? NO YES 7. Is the site of the proposed action located in, or does it adjoin, a state listed Critical Environmental Area? NO YES 8. a. Will the proposed action result in a substantial increase in traffic above present levels? b. Are public transportation services available at or near the site of the proposed action? c. Are any pedestrian accommodations or bicycle routes available on or near the site of the proposed action? NO YES 9. Does the proposed action meet or exceed the state energy code requirements? If the proposed action will exceed requirements, describe design features and technologies: NO YES 10. Will the proposed action connect to an existing public/private water supply? If No, describe method for providing potable water: _________________________________________ _____________________________________________________________________________________________ NO YES 11. Will the proposed action connect to existing wastewater utilities? If No, describe method for providing wastewater treatment: ______________________________________ _____________________________________________________________________________________________ NO YES archaeological sites on the NY State Historic Preservation Office (SHPO) archaeological site inventory? NO YES 13. a. Does any portion of the site of the proposed action, or lands adjoining the proposed action, contain wetlands or other waterbodies regulated by a federal, state or local agency? b. Would the proposed action physically alter, or encroach into, any existing wetland or waterbody? If Yes, identify the wetland or waterbody and extent of alterations in square feet or acres: _____________________ _____________________________________________________________________________________________ _____________________________________________________________________________________________ NO YES 12. a. Does the project site contain, or is it substantially contiguous to, a building, archaeological site, or district which is listed on the National or State Register of Historic Places, or that has been determined by the Commissioner of the NYS Office of Parks, Recreation and Historic Preservation to be eligible for listing on the State Register of Historic Places? b. Is the project site, or any portion of it, located in or adjacent to an area designated as sensitive for 14. Identify the typical habitat types that occur on, or are likely to be found on the project site. Check all that apply: 15. Does the site of the proposed action contain any species of animal, or associated habitats, listed by the State or Federal government as threatened or endangered? NO YES 16. Is the project site located in the 100-year flood plan? NO YES 17. Will the proposed action create storm water discharge, either from point or non-point sources? If Yes, a. Will storm water discharges flow to adjacent properties? b. Will storm water discharges be directed to established conveyance systems (runoff and storm drains)? NO YES 18. Does the proposed action include construction or other activities that would result in the impoundment of water or other liquids (e.g., retention pond, waste lagoon, dam)? If Yes, explain the purpose and size of the impoundment:______________________________________________ ____________________________________________________________________________________________ _ NO YES 19. Has the site of the proposed action or an adjoining property been the location of an active or closed solid waste management facility? NO YES 20.Has the site of the proposed action or an adjoining property been the subject of remediation (ongoing or completed) NO YES I CERTIFY THAT THE INFORMATION PROVIDED ABOVE IS TRUE AND ACCURATE TO THE BEST OF MY KNOWLEDGE Date: _____________________ Applicant/sponsor/name: ____________________________________________________ __________________________ Signature: _____________________________________________________Title:__________________________________ Bryan Healy 5/13/2022 Village Manager PRINT FORM

Machine-extracted for search and reference — the original PDF is the authoritative version.

Experimental project: croton.news uses AI to generate articles from public records. Content may contain errors. Please report any inaccuracies and check our corrections log.