Energy Code Memo
resolution
1 page
From the meeting:
Board Of Trustees — 2022-06-21
Agenda item: Proposed Resolutions — Consider adopting EAF Parts 2 and 3 Determination of Significance attached hereto, adopting a Negative Declaration under SEQRA and a statement of consistency with the Village's LWRP in connection with adopting Local Law Introductory No. 7 of 2022 as drafted for such purposes.
Resolution, 1 page. Attached to agenda item: “Proposed Resolutions — Consider adopting EAF Parts 2 and 3 Determination of Significance attached hereto, adopting a Negative Declaration under SEQRA and a statement of consistency with the Village's LWRP in connection w”
Retrieved 2026-07-31 from the village's meeting portal.
View the original PDF ↗
Also attached to this agenda item:
CAF for Stretch Code
EAF for Stretch Code
EAF Part II and Part III
LWRP LL Intro 7
Local Law Intro 7 of 2022 NYStretch
NY State Stretch Code Planning Board Memo
NYS Stretch for Residences-Summary and FAQ -...
NYStretch-Energy-Code-2020 3
NYStretch-Energy-Code-2020 Comparison
Res 100-2022 LL Intro 7 Adoption
Res 62-2022 LL Intro 7 PH
WAC Memo on NYStretch Code 2022
Extracted text
To:
From:
Date:
March 4, 2022
Re:
NYStretch Energy Code
Village Engineer Dan O’Connor, Assistant Engineer Ron Wegner and I met with members of the Sustainability
Committee and Trustee Liaison Len Simon this week to discuss the NYStretch Energy Code. This set of
standards is voluntary for municipalities to adopt and requires stricter energy standards for any new
construction.
Among the benefits listed by NYSERDA in the adoption of such a code are “significant energy and utility cost
savings for homeowners, tenants, renters and building owners; reduced building operational costs; reduced
environmental impact; increased occupant comfort and health; and increased real estate value and community
attractiveness.” I have included a number of backup materials regarding the energy code on the agenda for this
evening.
Numerous municipalities throughout the state have adopted the NYStretch Energy Code, including both
Cortlandt and the Town of Ossining in 2021.
I have tentatively scheduled a discussion on the energy code for the Board’s work session in May. If the Board
decides to move forward with adopting the code, a local law would be drafted and the Board would go through
the SEQRA process before adopting the local law. Please let me know if you have any questions regarding the
above.
Mayor
Brian Pugh
Trustees
Ann Gallelli
Sherry Horowitz
Alejandro Rosales
Len Simon
Village Manager
Bryan T. Healy
Treasurer
Daniel Tucker
Village Clerk
Pauline DiSanto
Village of Croton-on-Hudson New York
Stanley H. Kellerhouse Municipal Building
One Van Wyck Street
Croton-on-Hudson, NY 10520-2501
Machine-extracted for search and reference — the original PDF is the authoritative version.