NYStretch-Energy-Code-2020 Comparison
resolution
8 pages
From the meeting:
Board Of Trustees — 2022-06-21
Agenda item: Proposed Resolutions — Consider adopting EAF Parts 2 and 3 Determination of Significance attached hereto, adopting a Negative Declaration under SEQRA and a statement of consistency with the Village's LWRP in connection with adopting Local Law Introductory No. 7 of 2022 as drafted for such purposes.
Resolution, 8 pages. Attached to agenda item: “Proposed Resolutions — Consider adopting EAF Parts 2 and 3 Determination of Significance attached hereto, adopting a Negative Declaration under SEQRA and a statement of consistency with the Village's LWRP in connection w”
Retrieved 2026-07-31 from the village's meeting portal.
View the original PDF ↗
Also attached to this agenda item:
CAF for Stretch Code
EAF for Stretch Code
EAF Part II and Part III
Energy Code Memo
LWRP LL Intro 7
Local Law Intro 7 of 2022 NYStretch
NY State Stretch Code Planning Board Memo
NYS Stretch for Residences-Summary and FAQ -...
NYStretch-Energy-Code-2020 3
Res 100-2022 LL Intro 7 Adoption
Res 62-2022 LL Intro 7 PH
WAC Memo on NYStretch Code 2022
Extracted text
NYStretch Energy Code–2020
Comparison to 2020
Energy Conservation
Construction Code of NYS
NYStretch Energy Code–2020
Comparison to 2020 Energy Conservation
Construction Code of NYS
The following is a summary of the differences between the 2020 NYStretch Energy Code (NYStretch), the 2020 NYS
Energy Code (ECCCNYS-2020), and ASHRAE 90.1 2016. It is not intended to be a replacement for the actual language in the
NYStretch Code or the NYS Energy Code. One should always refer to the NYS Energy Code when determining compliance
as amended by the 2020 NYStretch Code language.
I. Differences between NYStretch and ECCCNYS-2020: Residential Buildings
Compliance Path Options – ONE of FOUR can be used:
1. Prescriptive and REScheck™ – R401 through R404 (Specific Prescriptive R-value or U-factor) and mandatory
requirements; regardless of compliance path, REScheck™ software most often used: or
2. Passive House – R401 through R404 and Passive House compliance, or
3. ERI Path – (R406), or
4. Simulated Performance Path – (R405) and mandatory provisions of R401 through R404. Building energy < 80% of the
standard reference design
Table R402.1.2 – Envelope (U-factor Table R402.1.4 changed accordingly. Prescriptive, e.g., can be traded.)
Climate
Zone 4
Fen
U-Factor
SkyLt
U-Factor
SHGC
Ceiling
R-Val
Wood
Wall
R-Value
Mass
Wall
R-Value
Floor
R-Val
Bsmt
Wall
R-value
Slab
R-Value/
Depth
Crawl Sp
Wall
R-Value
Stretch
Code
0.27
0.50
.04
21 or
20+5 or
13+10
15/20
30a
15/19
10, 4 ft.
15/19
Energy
Code
0.32
0.55
0.4
20 or
13+5
8/13
10/13
10, 2 ft.
10/13
Climate
Zone 5
Fen
U-Factor
SkyLt
U-Factor
SHGC
Ceiling
R-Val
Wood
Wall
R-Value
Mass
Wall
R-Value
Floor
R-Val
Bsmt
Wall
R-value
Slab
R-Value/
Depth
Crawl Sp
Wall
R-Value
Stretch
Code
0.27
0.50
NR
21 or
20+5 or
13+10
15/20
30a
15/19
10, 4 ft.
15/19
Energy
Code
0.30
0.55
NR
20 or
13+5
13/17
30a
15/19
10, 2 ft.
15/19
Climate
Zone 6
Fen
U-Factor
SkyLt
U-Factor
SHGC
Ceiling
R-Val
Wood
Wall
R-Value
Mass
Wall
R-Value
Floor
R-Val
Bsmt
Wall
R-value
Slab
R-Value/
Depth
Crawl Sp
Wall
R-Value
Stretch
Code
0.27
0.50
NR
21 or
20+5 or
13+10
15/20
30a
15/19
10, 4 ft.
15/19
Energy
Code
0.30
0.55
NR
20+5 or
13+10
15/20
30a
15/19
10, 4 ft.
15/19
Option 2
.28
0.55
NR
23 cav.
19/21
30a
15/19
10, 4 ft.
15/19
aAlternatively, insulation sufficient to fill the framing cavity and providing not less than an R-value of R-19.
NYStretch Energy Code–2020
Comparison to 2020 Energy Conservation
Construction Code of NYS
Provisions in NYStretch that are not in NYS Energy Code
■R402.2.2 Ceilings without attic spaces (cathedralized). – In the NYStretch Code, minimum insulation R-value is R-38
uncompressed out over exterior walls rather than R-30. As in the NYS Energy Code, this reduction in R-value is limited
to 500 sf or 20% of insulated roof area, whichever is less.
■Table R402.4.1.1 Insulation installation – NYStretch Code requires open wall visual inspection to ensure the quality
of the insulation installation. This requirement asks for more attention to openings around tub/showers, registers, and
Recessed Lighting.
■R403.3 Ducts – Ducts in new buildings must be located in conditioned space. Buried ducts can be considered in
conditioned space as in the NYS Energy Code, and must be installed/buried as prescribed by the NYS Energy Code.
In both NYStretch and the NYS Energy Code, duct leakage testing must be performed where ducts are buried in attic
insulation. The threshold is less than or equal to 1.5 cfm per 100 sf conditioned floor area for leakage to outdoors.
■R403.3.8 Duct sizing – NYStretch Code specifically requires that ducts must be sized in accordance with
ACCA Manual D (mandatory).
■R403.5.4 Drain water heat recovery units – Drain water heat recovery units must have a minimum efficiency of
40% if installed for equal flow or a minimum efficiency of 52% if installed for unequal flow. Requirements are
given for vertical and sloped drain water heat recovery units.
■R403.5.5 Supply of hot water – NYStretch Code requires one of the following: 1) maximum allowable pipe length
between water heater and fixture; 2) maximum allowable pipe volume between water heater and fixture;
3) drain-water heat recovery; or 4) recirculation system.
■R403.6.2 Balanced whole house mechanical ventilation – NYStretch Code requires HRV or ERV in Climate Zones 5
and 6 in every dwelling unit (mandatory). In Climate Zone 4, a central fan integrated system with simultaneous supply
and exhaust is an option.
■R403.6.3 Verification of ventilation – NYStretch Code requires verification of ventilation air flow by approved agency,
tested to ACCA HVAC Quality Installation Verification Protocols.
■R404.1 Lighting – NYStretch Code requires 90% high-efficacy lighting, with lamps at a minimum of 65 lumens per watt
and luminaires at minimum of 45 lumens/watt (mandatory).
■R404.2 Electrical power packages. (Mandatory for newly constructed buildings.) NYStretch Code requires:
• A solar-ready zone for newly constructed detached one- and two-family homes and townhomes that have more
than 1400 sf of conditioned floor area according to Appendix RA of the NYS Energy Code. The solar-ready
zone applies to buildings with at least 600 sf roof area between 110 degrees and 270 degrees of true north.
Exceptions are given for buildings shaded more than 70% of daylight hours annually and for those where an
on-site renewable energy system is permanently installed. Reserved electric panel space, roof-load calculation
and electrical pathway from roof to panel is required.
• Electric vehicle charging capability for one- and two-family detached homes and townhomes. 208V/240V outlet
for each dwelling unit or panel space and conduit for future installation of outlet. For common parking areas, the
code requires 1) panel capacity and conduit for future installation of 208/240V outlets for 5% of spaces, but
with a minimum of at least one space or 2) 208/240V outlets for 5% of parking spaces with a minimum of at
least one space.
■R404.2 ERI path – NYStretch requires an ERI of 50 PLUS the NYS Energy Code (as amended) mandatory
requirements and R403.5.3; NYS Energy Code requires ERI of 62 – Climate Zone 4, 61 for Zones 5 and 6.
■R408 Passive House – An optional compliance path in NYStretch; allows use of either PHIUS or PHI approved
software along with ECCCNYS-2020 prescriptive AND mandatory requirements. Dwelling unit MUST score a maximum
of 9.5 kbtuh/ft2/yr and be blower-door tested to meet air leakage or infiltration rates defined by the passive house
entities and NYStretch.
NYStretch Energy Code–2020
Comparison to 2020 Energy Conservation
Construction Code of NYS
II. Differences between NYStretch and ECCCNYS-2020: Commercial Buildings
Compliance Path Options:
1. ASHRAE 90.1 2016 Prescriptive Path – (Sections 5 through 10, as amended by NYStretch) plus section C408
(commissioning) of the NYS Energy Code (as amended by NYStretch) and Appendix CC if mandated by local
ordinance (Additional power distribution system packages), or
2. ASHRAE 90.1 2016 Energy Cost Budget Method – (Section 11, as amended by NYStretch) plus Section C408
(commissioning) of the NYS Energy Code (as amended by NYStretch), and Appendix CC if mandated by local
ordinance (additional power distribution system packages), or
3. ASHRAE 90.1 2016 Appendix G, Performance Rating Method – (as amended by NYStretch) Section C408
(commissioning) of the NYS Energy Code (as amended by NYStretch), and Appendix CC if mandated by local
ordinance (additional power distribution system packages), or
4. 2020 Energy Conservation Construction Code (NYS Energy Code), Prescriptive Path – (Sections C402 through
C406 and C408, as amended by NYStretch) and Appendix CC if mandated by local ordinance (additional power
distribution system packages).
Prescriptive Path
TABLE C402.1.4 – Comparison ECCCNYS-2020/NYStretch, U-factor Method ALSO used for ASHRAE 90.1 Prescriptive Path
OPAQUE THERMAL ENVELOPE ASSEMBLY MAXIMUM REQUIREMENTS, U-FACTOR METHODa, b
Climate Zone
All Other
Group R
All Other
Group R
All Other
Group R
Roofs
Insulation Entirely
above Roof Deck
U-0.032/
U-0.030
U-0.032/
U-0.030
U-0.032/
U-0.030
U-0.032/
U-0.030
U-0.032/
U-0.029
U-0.032/
U-0.029
Metal Buildings
U-0.035
U-0.035
U-0.035
U-0.035
U-0.031/
U-0.028
U-0.031/
U-0.026
Attic and Other
U-0.027/
U-0.020
U-0.027/
U-0.020
U-0.027/
U-0.020
U-0.021/
U-0.020
U-0.021/
U-0.019
U-0.021/
U-0.019
Walls, Above Grade
Masse
U-0.104/
U-0.099
U-0.090/
U-0.086
U-0.90/
U-0.086
U-0.080/
U-0.076
U-0.080/
U-0.076
U-0.071/
U-0.067
Metal Buildings
U-0.052/
U-0.048
U-0.052/
U-0.048
U-0.052/
U-0.048
U-0.052/
U-0.048
U-0.052/
U-0.048
U-0.052/
U-0.048
Metal Framed
U-0.064/
U-0.061
U-0.064/
U-0.061
U-0.064/
U-0.052
U-0.064/
U-0.052
U-0.064/
U-0.047
U-0.064/
U-0.044
Wood Framed
and Otherc
U-0.064/
U-0.061
U-0.064/
U-0.061
U-0.064/
U-0.048
U-0.064/
U-0.048
U-0.051/
U-0.048
U-0.051/
U-0.046
Walls, Below Grade
Below-Grade Wallc
C-0.119
C-0.119/
C-0.092
C-0.119
C-0.119/
C-0.092
C-0.119/
C-0.092
C-0.119/
C-0.063
NYStretch Energy Code–2020
Comparison to 2020 Energy Conservation
Construction Code of NYS
Climate Zone
All Other
Group R
All Other
Group R
All Other
Group R
Floors
Massd
U-0.076/
U-0.057
U-0.074/
U-0.051
U-0.074/
U-0.057
U-0.064/
U-0.051
U-0.064/
U-0.051
U-0.064/
U-0.051
Joist/Framing
U-0.033
U-0.033
U-0.033
U-0.033
U-0.033/
U-0.027
U-0.033/
U-0.027
Slab-on-Grade Floors
Unheated Slabs
F-0.54/
F-0.52
F-0.54/
F-0.52
F-0.54/
F-0.52
F-0.54/
F-0.51
F-0.54/
F-0.51
F-0.54/
F-0.434
Heated Slabs
F-0.86 0.64/
F-0.63
F-0.86 0.64/
F-0.63
F-0.79 0.64/
F-0.63
F-0.79 0.64/
F-0.63
F-0.79 0.55/
F-0.63
F-0.69 0.55/
F-0.63
Opaque Doors
Swinging Door
U-0.061/
U-0.050
U-0.061/
U-0.050
U-0.037
U-0.037
U-0.037
U-0.037
Garage Door
< 14% Glazing
U-0.031
U-0.031
U-0.031
U-0.031
U-0.031
U-0.031
For SI: 1 inch = 25.4 mm, 1 pound per square foot = 4.88 kg/m2, 1 pound per cubic foot = 16 kg/ 3 ci = Continuous insulation, NR = No Requirement,
LS = Liner System.
a Where assembly U-factors, C-factors, and F-factors are established in ANSI/ASHRAE/IESNA 90.1 Appendix A, such opaque assemblies shall be a
compliance alternative where those values meet the criteria of this table, and provided that the construction, excluding the cladding system on walls,
complies with the appropriate construction details from ANSI/ASHRAE/ISNEA 90.1 Appendix A.
b Where U-factors have been established by testing in accordance with ASTM C1363, such opaque assemblies shall be a compliance alternative where
those values meet the criteria of this table. The R-value of continuous insulation can be added to or subtracted from the original tested design.
c. Where heated slabs are below grade, below-grade walls shall comply with the U-factor requirements for above-grade mass walls.
d “Mass floors” shall be in accordance with Section C402.2.3.
e “Mass walls” shall be in accordance with Section C402.2.2.
NYStretch Energy Code–2020
Comparison to 2020 Energy Conservation
Construction Code of NYS
TABLE C402.1.3 – Comparison ECCCNYS-2020 versus NYStretch Table CB 102.2 (Also used for ASHRAE 90.1-2016;
MUST be adopted specifically by the jurisdiction)
OPAQUE THERMAL ENVELOPE INSULATION COMPONENT MINIMUM REQUIREMENTS, R-VALUE METHODa, h
Climate Zone
4 Except Marine
All Other
Group R
All Other
Group R
All Other
Group R
Roofs
Insulation Entirely
above Roof Deck
R-30ci/
R-33ci
R-30ci/
R-33ci
R-30ci/
R-33ci
R-30ci/
R-33ci
R-30ci/
R-33ci
R-30ci/
R-33ci
Metal Buildingsb
R-9.5 + R-11 LS
R-9.5 + R-11 LS
R-9.5 + R-11 LS
R-9.5 + R-11 LS
R-9.5 + R-11 LS/
R-30 + R-11 LS
R-9.5 + R-11 LS/
R-30 + R-11 LS
Attic and Other
R-38/
R-53
R-38/
R-53
R-38/
R-53
R-49/
R-53
R-49/
R-53
R-49/
R-53
Walls, Above Grade
Masse
R-9.5ci/
R-11.4ci
R-11.4ci/
R-13.3ci
R-11.4ci/
R-13.3ci
R-13.3ci/
R-15.2ci
R-13.3ci/
R-15.2ci
R-12.5ci
Metal Buildings
R-13 + R-13ci
R-13 + R-13ci/
R-13 + R-19.5ci
R-13 + R-13ci/
R-13 + R-19.5ci
R-13 + R-13ci/
R-13 + R-19.5ci
R-13 + R-13ci/
R-13 + R-19.5ci
R-13 + R-13ci/
R-13 + R-19.5ci
Metal Framed
R-13 + R-7.5ci/
R-13 + R-8.5ci
R-13 + R-7.5ci/
R-13 + R-8.5ci
R-13 + R-7.5ci/
R-13 + R-11ci
R-13 + R-7.5ci/
R-13 + R-11ci
R-13 + R-7.5ci/
R-13 + R-13.5ci
R-13 + R-7.5ci/
R-13 + R-14.5ci
Wood Framed
and Other
R-13 + R-3.8ci or
R-20/
R-13 + R-4.5ci or
R-19 + R-1.5ci
R-13 + R-3.8ci or
R-20/
R-13 + R-4.5ci or
R-19 + R-1.5ci
R-13 + R-3.8ci or
R-20/
R-13 + R-9ci or
R-19 + R-5ci
R-13 + R-7.5ci or
R-20 + R-3.8ci/
R-13 + R-9ci or
R-19 + R-5ci
R-13 + R-7.5ci or
R-20 + R-3.8ci/
R-13 + R-9ci or
R-19 + R-5ci
R-13 + R-7.5ci or
R-20 + R-3.8ci/
R-13 + R-9.5ci or
R-19 + R-6ci
Walls, Below Grade
Below-Grade Wallc
R-7.5ci
R-7.5ci/
R-10ci
R-7.5ci
R-7.5ci/
R-10ci
R-7.5ci/
R-10ci
R-7.5ci/
R-15ci
Floors
Massd
R-10c/
R-15ci
R-10.4c/
R-16.7ci
R-10c/
R-15ci
R-12.5c/
R-16.7ci
R-12.5c/
R-16.7ci
R-12.5c/
R-16.7ci
Joist/Framinge
R-30
R-30
R-30
R-30
R-30/
R-38
R-30/
R-38
NYStretch Energy Code–2020
Comparison to 2020 Energy Conservation
Construction Code of NYS
Climate Zone
All Other
Group R
All Other
Group R
All Other
Group R
Slab-on-Grade Floors
Unheated Slabs
R-10 for
12” below/
R-15 for
24” below
R-10 for
24” below/
R-15 for
24” below
R-10 for
24” below/
R-15 for
24” below
R-10 for
24” below/
R-15 for
24” below
R-10 for
24” below/
R-15 for
24” below
R-15 for
24” below
Heated Slabsg
R-15 for 24”
below + R-5
full slab/
R-20 for 48”
below + R-5
full slab
R-15 for 24”
below + R-5
full slab/
R-20 for 48”
below + R-5
full slab
R-15 for 36”
below + R-5
full slab/
R-20 for 48”
below + R-5
full slab
R-15 for 36”
below + R-5
full slab/
R-20 for 48”
below + R-5
full slab
R-15 for 36”
below + R-5
full slab/
R-20 for 48”
below + R-5
full slab
R-15 for 36”
below + R-5
full slab
Opaque Doors
Non-Swinging
R-4.75
R-4.75
R-4.75
R-4.75
R-4.75
R-4.75
For SI: 1 inch = 25.4 mm, 1 pound per square foot = 4.88 kg/m2, 1 pound per cubic foot = 16 kg/m3. ci = Continuous insulation, NR = No Requirement,
LS = Liner System.
a Assembly descriptions can be found in ANSI/ASHRAE/IESNA Appendix A.
b Where using R-value compliance method, a thermal spacer block shall be provided, otherwise use the U-factor compliance method in Table C402.1.4.
c Where heated slabs are below grade, below-grade walls shall comply with the exterior insulation requirements for heated slabs.
d “Mass floors” shall be in accordance with Section C402.2.3.
e Steel floor joist systems shall be insulated to R-38.
f “Mass walls” shall be in accordance with Section C402.2.2.
g The first value is for perimeter insulation and the second value is for slab insulation. Perimeter insulation is not required to extend below the bottom of the slab.
h Not applicable to garage doors. See Table C402.1.4.
Provisions in NYStretch that are not in NYS Energy Code
■C402.1.4.2 Thermal Resistance of Mechanical Equipment Penetrations (mandatory) – When the area of mechanical
equipment penetrations exceeds 1% of the opaque above-grade wall area, this shall be considered a separate wall
assembly with a default U-factor of 0.5.
■C402.2.8 Continuous Insulation (mandatory) – Balconies or parapets that penetrate building thermal envelope
must be 1) insulated with continuous insulation having R-value of at least R-3 or 2) incorporate a minimum R-3
thermal break where building envelope is penetrated.
■C402.5 Air Leakage (mandatory) and C402.5.9 Air Barrier Testing
• New buildings between 25,000 sf and 50,000 sf and < 75ft high shall be tested by blower door and have
leakage rates < 0.40 cfm/sf @ 75 pascals. These buildings must also comply with NYS Energy Code
requirements pertaining to air intakes, exhausts, stairways, and shafts; loading dock weather-seals; and
vestibules (C402.5.5, C402.5.6, and C402.5.7).
• Other new buildings may demonstrate compliance according to the above provisions or by complying with the
prescriptive requirements in Sections C402.5.1 through 402.5.8 and C408.4 (see below for description).
■C403.7.4 Energy Recovery Ventilation (mandatory) (previously C403.2.7) – Energy recovery ventilation is
mandatory when ventilation air flows exceed certain amounts. The NYS Energy Code and NYStretch requirements are
the same. NYStretch modified one exception to identify conditions with multiple exhaust fans or outlets.
■C403.8.1 Allowable Fan HP (mandatory) (previously C403.2.12.1) – Small differences regarding fan-power limitation
between NYS Energy Code and NYStretch, plus additional exceptions in NYStretch.
NYStretch Energy Code–2020
Comparison to 2020 Energy Conservation
Construction Code of NYS
C405 Lighting Controls (prescriptive)
1. Adds corridors and dining areas to locations where occupancy sensors are required (C405.2.1).
2. Adds occupancy sensor controls to dim lighting at building exits when unoccupied (C405.2.1.4).
3. Requires daylight responsive controls in spaces with more than 100 watts (versus 150 watts) of general lighting (C405.2.3).
4. Exterior lighting – unless controlled from within a dwelling unit, exterior lighting must be reduced by at least 50% during
certain times of day (C405.2.6).
5. Parking lot lighting – reduced by at least 50% when no activity detected for at least 15 minutes (C405.2.6.5).
6. Interior lighting – allowances for both building area method and space-by-space method there are more stringent by
about 10–20% (Tables C405.3.2([1 and 2]).
7. Exterior lighting – allowances for some areas that are slightly more stringent (Table C405.4.2[2]).
C405.8.1.1 Power Conversion System for Elevators (prescriptive) – Elevators with rise of more than 75ft are required to have
power conversion system. Motor shall have Class IE2 efficiency rating or alternative that has equal or better efficiency. Potential
energy released during motion shall be recovered and supplied to building electrical system.
C405.9 Commercial Kitchen Equipment (prescriptive) – Efficiency requirements for fryers, hot food holding cabinets, steam
cookers, dishwashers, ovens.
C405.10 Electric Vehicle Charging Capability (prescriptive) – Parking garages and lots with more than 10 spaces must
provide panel capacity and conduit for 208/240V outlets for at least 5% of parking spaces with a minimum of two or provide
the outlets for 5% of spaces with a minimum of two spaces.
C405.11 Solar-Ready Zone (mandatory) – Requires compliance with Appendix CA. Provide designated roof space for future
PV or solar thermal system on buildings that are five stories or less and oriented between 110 and 270 degrees of true north.
There are some exceptions such as an on-site renewable energy system, a building shaded more than 70% of daylight hours,
or a licensed design professional who certifies requirements for extensive rooftop equipment, vegetation, skylights, or other
obstruction. Requirements include a plan in design for and electrical conduit to roof from electrical panel, along with panel
space for the PV interface and roof-load calculations.
C405.12 Whole Building Energy and C405.13 Whole Building Electrical Monitoring (prescriptive) – Monitoring energy use
for all energy sources in new buildings except for buildings <25,000 sf; Group R buildings with <10,000 sf of common area; and
fuel use for on-site emergency equipment.
C406.1 Additional Energy Efficiency Packages
■On-site Renewable Energy option is now part of Appendix CC “Additional power distribution system packages.”
C407 Total Building Performance Method of Compliance
■Must comply with ASHRAE 90.1 2016 Compliance Path – Section 11 or Appendix G
C408.2 Commissioning this section is required when one of following conditions is met:
1. Building greater than 25,000 sf
2. Mechanical system capacity > 480,000 Btu/h
3. Combined water and space heating > 600,000 Btu/h
Includes more specific requirements/details for commissioning mechanical, renewable energy, and water heating systems.
HVAC systems must be balanced in accordance with ANSI/ASHRAE 111, “Testing, Adjusting, and Balancing of Building
HVAC Systems.”
C408.4 Air Barrier Commissioning – Registered design professional or approved agent shall provide documentation of air
barrier components and field inspection reports.
C502 and C503 Existing Buildings/Additions
■Commissioning required for new HVAC, water heating systems, and air barriers in additions.
Appendices
■Optional adoption by local jurisdiction or township
• Appendix CB: Prescriptive R-value tables
• Appendix CC: Additional Power Distribution System Packages
CODE-compare-fs-1-v3 9/20
Machine-extracted for search and reference — the original PDF is the authoritative version.