Neighbor Letters 425 SRA
site plan
9 pages
Scanned/OCR — text may contain errors
From the meeting:
Planning Board — 2026-07-28
· our coverage →
Agenda item: New Business — Carmel Riverside, LLC - 425 S. Riverside Ave (79.13-2-91) Applications for a Special Permit and Site Plan Approval for a New 49-Unit, Multi-Family Building
Site plan, 9 pages. Attached to agenda item: “New Business — Carmel Riverside, LLC - 425 S. Riverside Ave (79.13-2-91) Applications for a Special Permit and Site Plan Approval for a New 49-Unit, Multi-Family Building” (Text recovered by OCR — may contain errors.)
Retrieved 2026-09-29 from the village's meeting portal.
View the original file ↗
Also attached to this agenda item:
425 S Riverside Ave-Croton-Site Development Plans
Architectural Plans 425 S Riverside Signed 7.17.26
Coastal Assessment Form
Fiscal Report 425 SRA
Full Environmental Assessment Form
Gateway Overlay District Compliance Memo
Landscape Plan 425 SRA
NPV Memo 425 S Riverside Ave 07-24-2026
Neighbor Letters x 2 425 SRA
PB Application
PB Cover Letter 7.13.26
Preliminary Wastewater Engineering Report
Extracted text
Karen Stapleton
From: Chris Roose
Sent: Wednesday, July 22, 2026 2:48 PM
To: Brian Pugh; Board of Trustees; Karen Stapleton
Subject: Building Croton's Future Through Thoughtful Growth
External (chrisroose@fastmail.com)
Safe Spam Phish More... FAQ Protection by INKY
*** CAUTION: External sender.***
Dear Mayor, Trustees, and Members of the Planning Board,
| am writing because | care deeply about Croton and the direction it takes in the years ahead. | know
many of you personally, and | have seen the time, energy, and care you bring to serving this village. Local
government requires difficult choices, especially at a time when communities everywhere are grappling
with housing affordability, changing demographics, and competing demands on limited resources.
Croton should be part of the solution to the housing crisis. We should welcome new residents and create
opportunities for people to build their lives here. The question is not whether Croton should evolve; itis
how that evolution can best serve the village over the long term.
Too often, the housing conversation is framed as a choice between doing nothing and building large-
scale developments. There is another path. Thoughtful planning can add homes that fit the character of
Croton while providing the range of options people need. Missing-middle housing -- such as duplexes,
townhomes, and small multi-family buildings -- can expand opportunity while preserving the walkable
neighborhoods, connections, and sense of place that make Croton special.
The discussions around Lot A and the special permit application at 425 S. Riverside Avenue. reflect a broader
question about how Croton approaches development. Lot A was rezoned as a transit-oriented
development opportunity near the train station, a designation typically associated with walkable, mixed-
use districts that integrate housing, commerce, and public life. In practice, the Lot A process shifted
primarily toward residential density. Croton’s own history shows that the area around the railroad once
supported a vibrant commercial district that served as a focal point for employment and civic life. The
lesson is not that the village should recreate the past, but that transit-oriented development succeeds
when it creates places where people can live, work, gather, and connect. The separate proposal at 425 S.
Riverside Avenue. raises a related question about scale, context, and whether individual projects are being
considered as part of a larger vision. The issue is not simply how many homes can be added, but what
kind of place is created for the people who will live there—including whether they can move safely
through the neighborhood, enjoy a healthy environment, and experience a high quality of life beyond their
front doors.
The village’s handling of the cannabis dispensary application highlighted another important aspect of
public decision-making: transparency, communication, and trust. Regardless of one’s views on the
1
proposal itself, many residents were concerned that the village missed an opportunity to advocate
clearly for local interests and that the public was not meaningfully informed or engaged until very late in
the process. Confidence in local government depends not only on outcomes, but also on the process
that produces them.
Croton’s identity has always been built on more than buildings and tax revenue. Its landscape and
character have long attracted people who saw this place as something more than a suburb—a setting for
creativity, experimentation, and new ideas. Artists, writers, and social reformers have found inspiration
here, drawn by the belief that communities can be shaped around shared values and a richer sense of
human connection. That legacy is not simply part of Croton’s histon;; it is part of what gives the village its
character today.
My hope is that Croton’s continued evolution reflects the best of what has always made it distinctive: a
place that is welcoming, creative, connected, and mindful of the character that makes it unique.
Housing, development, and change are part of any living place. The responsibility is to guide those
decisions in a way that builds upon what already exists rather than diminishing it.
Growth is inevitable. The challenge is to ensure that it reflects the values and vision that have defined
Croton for generations.
Chris Roose
55 Truesdale Dr.
2
Rita Wilcox
8 Devon Avenue
Croton-on-Hudson, NY 10520
July 23, 2026
Planning Board
Village of Croton-on-Hudson
1 Van Wyck Street
Croton-on-Hudson, NY 10520
Dear Planning Board Members,
| am writing to urge the board to protect the community character of Croton by denying the
site plan for 425 South Riverside Avenue.
| am a native of Croton and in 1967 purchased the house in Harmon that | am presently
living in. The proposed building would be only a few hundred feet from my back yard. |
would essentially overlook the roof of the building.
Croton is a unique historic village with beautiful vistas, historic homes and a small-town
vibe. People move here and stay here because Croton has avoided the faceless
overdeveloped sprawl that plagues so many other parts of Westchester County.
The proposed three-story, 49-unit complex is completely out of scale and out of character
with the surrounding neighborhood. It is an overly aggressive use of a highly constrained
fragile, steep slope piece of land.
Please protect the visual and structural character of our village and deny this application.
Don’t let the gateway to our village feel cramped and overbuilt. Thank you.
Ki. We
7a t | Hole
6 Young Ave.
Village of Croton
Stanley H. Kellerhouse Municipal Building
One Van Wyck St.
Attn: Planning Board:
| am writing to cppose the proposal of 425 Riverside Avenue. based on the severe
traffic and safety issues it will cause.
Anyone who drives through our village knows the this specific stretch of South Riverside Avenue is already a heavily congested bottleneck. It sits directly across from
the busiest commercial hub in our area: the ShopRite plaza entrance. On any given
afternoon or weekend, traffic is chaotic. Cars are constantly turning, delivery
trucks are blocking lanes, and drivers are distracted.
Now, the developer wants to inject the vehicle traffic of 49 new residential
households directly into this mix.lf you assume a modest average of 1.5 cars per
unit, that is roughly 75 additional vehicles pulling out onto, and turning across a
major village artery every single day during peak commuting house.
When the Blaze is going on during the Fall, the traffic is also immense.
My deepest concern is pedestrian safety. This area sees heavy foot traffic
from residents walking to the store or navigating down toward the train station. It
is not a matter of if an accident will happen, but when.
A project of this density does NOT belong on this specific corridor. Our roads
cannot handle it and the safety of our pedestrians should not be compromised for
a developer's profit margins. | urge the Planning Board to DENY THIS SITE PLAN
APPROVAL.
Thank you for taking the time to reevaluate this proposal. | am unable to
attend the meeting .
Elizabeth A Burns
Page 1 of
July 26, 2026
Planning Board
Village of Croton-on-Hudson
Stanley H. Kellerhouse Municipal Building
One Van Wyck Street
Croton-on-Hudson, NY 10520
Attn: Karen Stapleton
Planning Board Secretary
CC: Board of Trustees
I am Joe Bencivenga. I reside at 18 Devon Avenue, here in Croton.
I want to offer some observations on the proposed residential development,
425 S Riverside Avenue, specifically the fiscal aspects.
Anticipated Revenue
On the question of tax revenue, we have only the report of the developer’s
consultant to rely on. The Village assessor has offered no estimate of the
assessment of the project and has made it known to the consultant,
according to the consultant's report.
“The assessed value of the Proposed Action will be determined by the
Village of Croton-on-Hudson Assessor following completion of
construction and therefore is not available at this time.” (p.8 of July
13, 2026, Fiscal Report).
If the consultant can estimate the anticipated tax revenue, why can’t our
own assessor do the same?
Is the Village assessor’s estimate not critical in the determination of whether
the project is a plus or a minus for the taxpayers?
Letter to the Planning Board, July 28, 2026, Cont’d
School District Impact
Here we have only the consultant’s report for reference which report says
the additional annual school tax revenue will exceed the additional cost to
educate a projected 11 school-age children.
I am sure you have read the consultant’s report but might I ask you to look
it over again, particularly p. 10. No mention is made there of any contact
with the School Superintendent. We don’t know if the Superintendent was
approached by the consultant only to be rebuffed or if there was no contact
with him at all.
I placed a call to the Superintendent Stephen Walker but received no reply
to date. I wanted to ask his opinion on the consultant’s projection of school
age children and on the costs associated with educating them. Will more
teachers be needed? Is the school district prepared to absorb the student
influx in terms of space, equipment, transportation? Are the developer’s
estimates reasonable?
If there is anyone you would want to talk with about these issues, I would
think it would be the Schools Superintendent. Yet we have no record of any
such contact.
Impact on the Police, Fire Protection, EMS, Parks and Recreation
Functions, Water and Sewer Service:
As you might expect, the consultant’s conclusions are predictable.
For the Police:
“The proposed increase in population will not result in a need for
additional staff, vehicles, or facility space, therefore, no significant
adverse impact to the Police Department is anticipated.” (p5)
For Fire Protection:
“The proposed increase in population will not result in a need for
additional staff, vehicles, or facility space, therefore, no significant
adverse impact to the fire district is anticipated.” (p.6)
2
Letter to the Planning Board, July 28, 2026, Cont’d
For EMS:
“The proposed increase in population is not likely to result in a need
for additional staff, vehicles, or facility space, therefore, no significant
adverse impact to the EMS district is anticipated.” (p. 6-7)
For Parks and Recreational Facilities:
The proposed increase in population is not likely to result in a need for
additional parks and recreation staff, equipment, or facilities,
therefore, no significant adverse impact to Parks and Recreational
Facilities are anticipated. (p.7)
For Solid Waste and Recycling:
The proposed increase in population is not likely to result in a need for
additional staff, vehicles, or facility space, therefore, no significant
adverse impact to Solid Waste and Recycling are anticipated. (p.7)
For Water:
The consultant demonstrates that its calculators are working fine but
offers no opinion on whether the water demand by the project will
require extensive modifications to the infrastructure to meet the needs
of the families who will occupy the residences.
For Sewer:
The consultant sidesteps what structural changes must be made to
meet the demand for wastewater disposal and instead attempts to
paper over the issue with calculations of estimated gallons of
wastewater, wastewater generation of so many units per day, and the
like.
None of the conclusions above are the result of contact with people ‘in the
know’, i.e., the department heads. Why not?
I've been told by an anonymous source that it is likely that more hires will
be needed in one or more of the various departments in response to this and
other multi-residential developments in the pipeline. If that information is
true, the consultant’s report is possibly unreliable.
3
Letter to the Planning Board, July 28, 2026, Cont’d
It is a foregone conclusion that if 425 S Riverside doesn’t overstress the
Village fiscal and financial resources--which I believe it will--surely it and the
other multi-residential development in the pipeline near the train station will.
It is myopic to view this project as a standalone, ignoring the other planned
project.
Need for Independent Professional Review
On projects like this one municipalities have been known to hire their own
independent review consultant. The Planning Board has had no such
independent resource hired or available. Why not?
Please note that the consultant Kimley-Horn never found a
multi-residential project in New York State it did not like. On the contrary,
Kimley-Horn has served consistently as the applicants’ advocate opining
favorably on all multi-residential projects in the State to date.
To conclude, the Planning Board is being asked to approve the applicant’s
request for a special permit with no input from the Village’s own
assessor, with no independent review by its own consultant, and with
no input from its own department heads.
If you were faced with a serious medical diagnosis, which of you would not
seek a second opinion. Yet here on this controversial project we are doing
exactly that. This is hardly an exercise in prudence.
In these circumstances I don’t see how you can make an informed decision
on the matter before you. In the best interests of the Village residents, at
the very least you must postpone any decision on this proposed
development. If you must decide at this time, then denial of the permit
would be the only prudent decision.
pete V (Bercivonga.
Joseph V. Bencivenga
18 Devon Avenue
Croton on Hudson, N.Y. 10520
4
Croton-on-Hudson Planning Board
1Van Wyck St.
Dear Chairman Luntz and Members of the Planning Board:
I am writing regarding the proposed development at 425 South Riverside Avenue.
I wish to address the severe environmental degradation that will occur if the 425 South Riverside
proposal is approved.
The parcel in question contains a vital stand of mature trees and natural vegetation that climbs the steep
slope. This green buffer serves several critical ecological functions. It absorbs carbon, mitigates local
heat, provides a habitat for displaced local wildlife, and acts as a natural visual buffer that preserves the
small-town aesthetic of Croton-on-Hudson.
Building a massive three-story complex here means clear-cutting this hillside. We will be replacing a
living ecosystem with an imposing wall of wood, glass, and concrete. The destruction of these mature
trees will permanently scar the corridor.
The developer must be forced to rigorously analyze the environmental damage they are about to cause
and look at less dense alternatives. Better yet, given the high environmental risks of this specific
terrain, the board should deny the special permit entirely.
Frank Burrows
13 Devon Ave.