Coastal Assessment Form
site plan
6 pages
From the meeting:
Planning Board — 2026-07-28
· our coverage →
Agenda item: New Business — Carmel Riverside, LLC - 425 S. Riverside Ave (79.13-2-91) Applications for a Special Permit and Site Plan Approval for a New 49-Unit, Multi-Family Building
Site plan, 6 pages. Attached to agenda item: “New Business — Carmel Riverside, LLC - 425 S. Riverside Ave (79.13-2-91) Applications for a Special Permit and Site Plan Approval for a New 49-Unit, Multi-Family Building”
Retrieved 2026-07-24 from the village's meeting portal.
View the original PDF ↗
Coastal Assessment Form for the proposed 3-story, 49-unit residential building with parking, stormwater facilities, and landscaping at 425 S. Riverside Avenue, a 1.93-acre site currently occupied by a commercial building and parking lot in the C-2/Harmon-South Riverside Gateway Overlay District. The form notes steep slopes of roughly 30 percent along the rear of the property and states that disturbed ground cover will be mitigated through a stormwater management pollution prevention plan. Sponsor is listed as Carmel Riverside LLC (Andrew Cortese) of Dobbs Ferry.
AI summary — generated from the document text; check the original before relying on details
Also attached to this agenda item:
425 S Riverside Ave-Croton-Site Development Plans
Architectural Plans 425 S Riverside Signed 7.17.26
Fiscal Report 425 SRA
Full Environmental Assessment Form
Gateway Overlay District Compliance Memo
Landscape Plan 425 SRA
NPV Memo 425 S Riverside Ave 07-24-2026
Neighbor Letters x 2 425 SRA
Neighbor Letters 425 SRA
PB Application
PB Cover Letter 7.13.26
Preliminary Wastewater Engineering Report
Extracted text
A. INSTRUCTIONS (Please print or type all answers)
1.
Applicants, or in the case of direct actions (city, town, village) agencies, shall complete this CAF for
proposed actions which are subject to the consistency review law. This assessment is intended to supplement other
information used by a (city, town, village) agency in making a determination of consistency.
2.
Before answering the questions in Section C, the preparer of this form should review the policies and
explanations of policy contained in the Local Waterfront Revitalization Program (LWRP), a copy of which is on file
in the (city, town, village) clerk's office. A proposed action should be evaluated as to its significant beneficial and
adverse effects upon the coastal area.
3.
If any question in Section C on this form is answered "yes", then the proposed action may affect the
achievement of the LWRP policy standards and conditions contained in the consistency review law. Thus, the action
should be analyzed in more detail and, if necessary, modified prior to making a determination that it is consistent to
the maximum extent practicable with the LWRP policy standards and conditions. If an action cannot be certified as
consistent with the LWRP policy standards and conditions, it shall not be undertaken.
1. Type of (city, town, village) agency action (check appropriate response):
a) Directly undertaken (e.g. capital construction, planning activity, agency
regulation, land transaction) _____________________________________________
b) Financial assistance (e.g. grant, loan, subsidy) ______________________________
c) Permit, approval, license, certification _____________________________________
d) Agency undertaking action ______________________________________________
2. Describe nature and extent of action: _________________________________________
3. Location of actions: _______________________________________________________
(street or site description)
N/A
N/A
Approval of Special Permit and Site Plan
Village Planning Board
proposed 3-story, 49 unit residential building with
associated parking, stormwater management facilities, landscaping and related improvements.
425 S. Riverside Avenue (Section 79.13 Block 2 Lot 91
1.93 acres
commercial building w/ parking lot and other site improvements
C-2 (Harmon / South Riverside Gateway Overlay District)
7. List and describe any unique or unusual land forms within or contiguous to the project
site (i.e. bluffs, dunes, swales, ground depressions, other geological formations):
8. Percent of site which contains slopes of 15% or greater: __________________________
9. List and describe streams, lakes, ponds or wetlands existing within or contiguous to the
project area. Give name and size of each if available:
a)
b)
10. If an application for the proposed action has been filed with the (city, town, village)
a)
b)
c)
d)
11. Will the action be directly undertaken, require funding or approval by a state or federal
agency?
If yes, which state or federal agency? ___________________________
12. If the proposed action is a law, or planning or zoning document, SKIP Section “C” and go to Section “E”.
YES
NO
N/A
1. Will the proposed action be located in, or contiguous to,
or have a potentially adverse effect upon any of the resource
areas identified on the coastal area map:
b) Scenic resources of local or statewide significance?
c) Natural protective features in an erosion hazard area?
If the answer to any question above is "yes", please explain in Section D any measures which will be
undertaken to mitigate any adverse effects.
Steep slopes along the rear of the property
+/- 30%
n/a
n/a
Carmel Riverside LLC (Andrew Cortese)
185 Ashford Avenue, Dobbs Ferry NY 10522
447-3965
TBD
X
X
X
X
X
YES
NO
N/A
2. Will the proposed action have a significant effect upon:
a) Commercial or recreational use of fish and wildlife resources? _____ _____ _____
b) Scenic quality of the coastal environment?
c) Development of future or existing water dependent uses?
e) Land or water uses within a small harbor area?
i) Structures, sites or districts of historic, archeological or
cultural significance to the (city, town, village), State or
nation?
3. Will the proposed action involve or result in any of the following:
a) Physical alteration of land along the shoreline, land under
water or coastal waters?
b) Physical alteration of two (2) acres or more of land located
elsewhere in the coastal area?
c) Expansion of existing public services or infrastructure in
undeveloped or low density areas of the coastal area?
d) Energy facility not subject to Article VII or VIII of the
Public Service Law?
e) Mining, excavation, filling or dredging in coastal waters?
f) Reduction of existing or potential public access to or along
the shore?
g) Sale or change in use of publicly-owned lands located on
shoreline or under water?
h) Development within a designated flood or erosion hazard area? _____ _____ _____
i) Development on a beach, dune, barrier island or other natural
feature that provides protection against flooding or erosion?
j) Construction or reconstruction of erosion protective structures? _____ _____ _____
k) Diminished surface or groundwater quality?
l) Removal of ground cover from the site?
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
4.
Project
YES
NO
N/A
a) If project is to be located adjacent to shore:
2. Will public access to the foreshore be provided?
3. Does the project require a waterfront site?
4. Does it supplant a recreational or maritime use?
5. Do essential public services and facilities presently exist at
or near the site?
6. Is it located in a flood prone area?
7. Is it located in an area of high erosion?
b) If the project site is publicly owned:
1. Will the project protect, maintain and/or increase the level
and industrial facilities into coastal facilities?
2. If located in the foreshore, will access to those and adjacent
lands be provided?
3. Will it involve the siting and construction of major energy
facilities?
4. Will it involve the discharge of effluent from major steam
electric generating and industrial facilities into coastal
facilities?
c) Is the project site presently used by the community neighborhood
as an open space or recreation area?
d) Does the present site offer or include scenic views or vistas
known to be important to the community?
e) Is the project site presently used for commercial fishing or fish
processing?
f) Will the surface area of any waterways or wetland area be
increased or decreased by the proposals?
g) Does any mature forest (over 100 years old) or other locally
important vegetation exist on this site which will be removed
by the project?
h) Will the project involve any waste discharges into coastal waters? _____ _____ _____
i) Does the project involve surface or subsurface liquid waste
disposal?
j) Does the project involve transport, storage, treatment or disposal
of solid waste or hazardous materials?
k) Does the project involve shipment or storage of petroleum
products?
X
X
X
X
X
X
X
X
X
X
X
4. Project (continued)
YES
NO
N/A
l) Does the project involve discharge of toxic hazardous
substances or other pollutants into coastal waters?
m) Does the project involve or change existing ice management
practices?
n) Will the project affect any area designated as a tidal or
freshwater wetland?
o) Will the project alter drainage flow, patterns or surface water
runoff on or from the site?
p) Will best management practices be utilized to control storm
water runoff into coastal waters?
q) Will the project utilize or affect the quality or quantity of sole
source or surface water supplies?
r) Will the project cause emissions which exceed federal or state
air quality standards or generate significant amounts of nitrates
or sulfates?
For questions answered “yes” in Section C, explain methods you will undertake to reduce adverse
effects. Review the LWRP to see if the project is consistent with each policy. List policies the
project is not consistent with and explain all mitigating actions.
(Add any additional sheets necessary to complete this form)
X
X
X
X
X
X
X
Removal of existing ground cover will occur and the disturbed areas will be
mitigated via a stormwater management pollution prevention plan that will serve to
prevent any adverse impacts from the proposed disturbances.
The final version of this form shall be sent to the Department of State (New York State Dept. of
State, Coastal Management Program, 162 Washington Avenue, Albany, NY 12231) if any question
in Section C is answered “yes” and either of the following conditions is met.
If assistance or further information is needed to complete this form, please contact the Village
Engineer at (914) 271-4783.
Keith Staudohar, CPESC CPSWQ
Project Manager
Cronin Engineering
736-3664
01-30-26
keith@croninengineering.net
Machine-extracted for search and reference — the original PDF is the authoritative version.